Facility page identifies Southport, planning status, 6 MW IT capacity, 4,600 m² technical space and target Tier IV Uptime Institute certification.
Australia / Facility
GC1 Gold Coast Data Centre · GC1 Gold Coast
Planned NEXTDC data centre in Southport, Gold Coast, Queensland, Australia. The operator advertises 6 MW of IT capacity and 4,600 square metres of technical space. The August 2026 presentation retains design and town planning status, approximately 6 MW total planned power subject to development approval, and approximately 1 MW initial capacity. Property-level location and ownership remain unresolved.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 6 MW IT load | GC1 advertised proposed full facility IT capacity Planned · cumulative | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. As-of is retrieval date of an undated live facility page. Advertised design capacity, not commissioned capacity; exceeds 5 MW on a planned IT basis. |
| ≈6 MW Unspecified power | GC1 total power planned Planned · cumulative | 2026-08-27 | Reported claim ↗ Excluded from capacity totals. As-of is presentation date. Subject to development approval. The slide does not explicitly identify IT, facility or grid basis; overlaps the advertised 6 MW and must not be added to it. |
| ≈1 MW Unspecified power | GC1 initial capacity Planned · incremental | 2026-08-27 | Reported claim ↗ Excluded from capacity totals. As-of is presentation date. Initial subset of total planned capacity, not additional to 6 MW; power basis unspecified. |
| ≈1.2 MW Unspecified power | GC1 historical initial capacity proposal Planned · incremental | 2025-02-24 | Reported claim ↗ Excluded from capacity totals. As-of is presentation date. Historical initial proposal differs from approximately 1 MW in February and August 2026 materials; reason for revision undisclosed. Not additive to full facility capacity. |
Half-year presentation identifies GC1 as a planned approximately 6 MW development with approximately 1.2 MW initial capacity.
Supporting source ↗Half-year presentation retains design and town planning status and approximately 6 MW total planned power.
Supporting source ↗Full-year presentation continues to show design and town planning; no GC1 practical completion date is stated in its project entry.
Supporting source ↗Operator describes GC1 as supporting regional digital demand; portfolio grouping under Brisbane does not establish Brisbane as the property city.
Source ↗Advertised proposed technical space; not land area or confirmed total building floor area.
Source ↗Target certification only; achieved certification is not established.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Facility page identifies Southport, planning status, 6 MW IT capacity, 4,600 m² technical space and target Tier IV Uptime Institute certification.
Published 2026-08-27 · Retrieved 2026-10-09
Page 30: GC1 Gold Coast remains in design and town planning; approximately 6 MW total planned power subject to development approval and approximately 1 MW initial capacity.
Published Date unavailable · Retrieved 2026-10-09
Page 4 includes GC1 Gold Coast in the Australian portfolio. Corporate certification tables do not establish GC1 certification.
Published Date unavailable · Retrieved 2026-10-09
Page 5 describes advanced negotiations for Gold Coast GC1 and Geelong GE1 as additional edge facilities.
Published Date unavailable · Retrieved 2026-10-09
Lists NEXTDC GC1 within Southport, Gold Coast, Queensland, Australia; repeats operator planning and 6 MW description without a street address.
Published 2025-02-24 · Retrieved 2026-10-09
Page 27 reports approximately 6 MW total planned power, subject to development approval, and approximately 1.2 MW initial capacity; design and town planning.
Published 2026-02-25 · Retrieved 2026-10-09
Page 29 reports approximately 6 MW total planned power subject to approval, approximately 1 MW initial capacity, and design and town planning.
Name: GC1 Gold Coast — NEXTDC; NEXTDC FY26 Results Presentation
Aliases: GC1 Gold Coast — NEXTDC
Kind: GC1 Gold Coast — NEXTDC
Country: NEXTDC FY26 Annual Report & Appendix 4E; Gold Coast Data Centers — Data Center Map
Region: Gold Coast Data Centers — Data Center Map
City: GC1 Gold Coast — NEXTDC; Gold Coast Data Centers — Data Center Map
Operator: GC1 Gold Coast — NEXTDC; NEXTDC FY26 Annual Report & Appendix 4E
Scale: NEXTDC FY24 ESG Report
Statuses: GC1 Gold Coast — NEXTDC; NEXTDC FY26 Results Presentation
Summary: GC1 Gold Coast — NEXTDC; NEXTDC FY26 Results Presentation; Gold Coast Data Centers — Data Center Map
Location: GC1 Gold Coast — NEXTDC
Stable identifier: 9bba431f-2be0-4fb1-9c12-88ab8dd530d5