BDx CGK5 Suryacipta campus — supporting evidence ↗
Published Date unavailable · Retrieved 2026-09-11
BDx identifies CGK5 in Suryacipta at 300 MW, with high-voltage infrastructure being advanced.
Indonesia / Site
CSV-authorized Karawang extension. 300 MW is a development figure, separate from 385 MVA secured power.

Rendering
Architectural rendering: BDx CGK5 Suryacipta campus.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
www.bdxworld.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 300 MW Unspecified power | Reported design/development capacity; delivered share unconfirmed Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. CSV-authorized Karawang extension. 300 MW is a development figure, separate from 385 MVA secured power. |
| 290 MW IT load | CGK5 secured phased IT development Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Source-reported design/announced capacity, not measured consumption. Excluded from aggregation pending reconciliation. |
Source-backed research proposal; publication requires review.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
BDx identifies CGK5 in Suryacipta at 300 MW, with high-voltage infrastructure being advanced.
Published Date unavailable · Retrieved 2026-09-11
CGK5 states 290 MW secured phased IT development and 385 MVA utility supply.
Published Date unavailable · Retrieved 2026-09-11
Named place result BDx Data Center | CGK5 | Suryacipta; POI coordinates -6.4194098, 107.359251. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Published Date unavailable · Retrieved 2026-09-11
Architectural rendering: BDx CGK5 Suryacipta campus. Image reference: https://www.bdxworld.com/wp-content/uploads/2026/06/dc-ag-cgk5.jpg Visually inspected against the cited source and profile identity.
Published Date unavailable · Retrieved 2026-09-11
BDx operator brand mark. Image reference: https://www.bdxworld.com/wp-content/uploads/2026/06/bdx-light-full.svg Visually inspected against the cited source and profile identity.
Name: BDx CGK5 Suryacipta campus — supporting evidence
Kind: BDx CGK5 Suryacipta campus — supporting evidence
Country: BDx CGK5 Suryacipta campus — supporting evidence
Region: BDx CGK5 Suryacipta campus — supporting evidence
Metro: BDx CGK5 Suryacipta campus — supporting evidence
City: BDx CGK5 Suryacipta campus — supporting evidence
Operator: BDx CGK5 Suryacipta campus — supporting evidence; BDx · CGK5 technical profile
Statuses: BDx CGK5 Suryacipta campus — supporting evidence
Summary: BDx CGK5 Suryacipta campus — supporting evidence
Location: Google Maps · BDx Data Center | CGK5 | Suryacipta
Media: Property imagery · www.bdxworld.com
Operator Logo: Operator logo · www.bdxworld.com
Stable identifier: c82f4a05-8958-45d5-be00-d7d9b38d9cf7