Thailand / Site

DayOne CTP

Under ConstructionPlanned

Grid capacity, not IT load. Solar MWp and wider 1 GW power-platform ambitions are excluded.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 3
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
DayOne
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Chon Buri / Chon Buri
City / locality
Unknown
Address
Unknown
Location
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Precision: approximate · 13.4342237, 101.063391
View location on map →
Parent
Not assigned

Location detail

Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

Address unknown

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
180 MW
Grid connection
Reported design capacity; energized and occupied load not established
Planned · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review. Grid capacity, not IT load. Solar MWp and wider 1 GW power-platform ambitions are excluded.

300 MW
Unspecified power
Expanded CTP1 site power target; not CTP2 or delivered IT load
Planned · cumulative
2025-11-10Reported claim ↗

Excluded from capacity totals. Source-reported design/announced capacity, not measured consumption. Excluded from aggregation pending reconciliation.

Development timeline

  1. No dated milestones established.

Disclosed specifications

Research clarification · 2026-09-11

Original 180 MW grid agreement is retained separately from the later 300 MW expansion target.

Source-backed research proposal; publication requires review.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Google Maps · DayOne Chon Buri Tech Park ↗

Published Date unavailable · Retrieved 2026-09-11

Named place result DayOne Chon Buri Tech Park; POI coordinates 13.4342237, 101.063391. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.

Operator logo · dayonedc.com ↗

Published Date unavailable · Retrieved 2026-09-11

DayOne operator brand mark. Image reference: https://dayonedc.com/markets/singapores-dayone-breaks-ground-on-first-data-center-in-singapore#header-logo Visually inspected against the cited source and profile identity.

Profile field evidence

Name: DayOne Chonburi groundbreaking

Operator: DayOne Chonburi groundbreaking; DayOne · CTP1 expansion announcement

Country: DayOne Chonburi groundbreaking

Region: DayOne Chonburi groundbreaking

Metro: DayOne Chonburi groundbreaking

Kind: DayOne Chonburi groundbreaking

Statuses: DayOne Chonburi groundbreaking

Summary: DayOne Chonburi groundbreaking

Aliases: DayOne Chonburi groundbreaking

Location: Google Maps · DayOne Chon Buri Tech Park

Operator Logo: Operator logo · dayonedc.com

Stable identifier: ca15e1b0-0757-49ba-a74e-7e5e42d24e75