← DayOne Chonburi Tech Park campusPublished history
Restoring content creates a new revision. Previous revisions remain in the audit trail.
Revision 3 · Current
2026-09-11 12:15 UTC
Published profile snapshot
DayOne Chonburi Tech Park campus · Thailand · DayOne
Grid capacity, not IT load. Solar MWp and wider 1 GW power-platform ambitions are excluded.
Capacity statements: 2 · Sources: 4
180 MW (exact) · grid · Reported design capacity; energized and occupied load not established · 2026-09-11
300 MW (exact) · unspecified · Expanded CTP1 site power target; not CTP2 or delivered IT load · 2025-11-10
Revision 2
2026-09-11 11:26 UTC
Published profile snapshot
DayOne Chonburi Tech Park campus · Thailand · DayOne
Grid capacity, not IT load. Solar MWp and wider 1 GW power-platform ambitions are excluded.
Capacity statements: 2 · Sources: 3
180 MW (exact) · grid · Reported design capacity; energized and occupied load not established · 2026-09-11
300 MW (exact) · unspecified · Expanded CTP1 site power target; not CTP2 or delivered IT load · 2025-11-10
Revision 1
2026-09-11 09:06 UTC
Published profile snapshot
DayOne Chonburi Tech Park campus · Thailand · DayOne
Grid capacity, not IT load. Solar MWp and wider 1 GW power-platform ambitions are excluded.
Capacity statements: 1 · Sources: 1
180 MW (exact) · grid · Reported design capacity; energized and occupied load not established · 2026-09-11