Equinix SL2x facility page ↗
Published Date unavailable · Retrieved 2026-10-07
Lists the Goyang street address and identifies SL4 as located inside SL2x; publishes current building specifications.
South Korea / Site
Campus-level grouping of adjacent Equinix SL2x and SL3x in Hyangdong, Goyang. SL2x is operational and contains the SL4 retail IBX. SL3x contractor records describe construction with a September 2025–December 2027 contract period; commissioning is unconfirmed. SL2x capacity publications conflict between 20 MW and 22 MW IT, with additional 24 MW whole-building reporting. No reconciled campus total is adopted.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 22 MW IT load | SL2x Operational · cumulative | 2026-10-07 | Conflicting claim ↗ Excluded from capacity totals. As-of is retrieval date; sheet carries copyright 2024 without an established publication date. Technical table explicitly identifies IT power. Conflicts with current country FAQ. |
| 20 MW Unspecified power | SL2x xScale offering Operational · cumulative | 2026-10-07 | Conflicting claim ↗ Excluded from capacity totals. As-of is retrieval date of undated current FAQ. SL2x sentence says supports 20 MW; preceding retail sentence explicitly uses IT capacity, but SL2x basis is not separately defined. Conflicts with 22 MW technical sheet. |
| 24 MW Unspecified power | SL3x future capacity Planned · cumulative | 2026-10-07 | Reported claim ↗ Excluded from capacity totals. As-of is retrieval date; copyright 2024 is not treated as publication date. Future design capacity, not evidence of energized capacity or opening. |
| >45 MW Unspecified power | SL2x and SL3x combined joint-venture development Planned · cumulative | 2022-01-26 | Reported claim ↗ Excluded from capacity totals. Announcement-date combined development forecast; overlaps individual facility claims and must not be added to them. |
| 24 MW Unspecified power | SL2x whole building including general-enterprise allocation Operational · cumulative | 2024-09-26 | Conflicting claim ↗ Excluded from capacity totals. Management remarks reported by Yonhap describe 2 MW allocated to general enterprises within 24 MW. This may explain part of the 22 MW distinction but does not reconcile the later 20 MW claim. |
| 40 MW Facility power | SL2x active electrical supply design Operational · cumulative | 2026-10-07 | Reported claim ↗ Excluded from capacity totals. Retrieval-date architect specification lists 40 MW active plus 40 MW standby. Standby is redundancy, not additional sellable capacity; actual energized demand is unknown. |
| 12 MW Unspecified power | SL2x first phase, Seoul 2x-1 Planned · incremental | 2023-11-24 | Reported claim ↗ Excluded from capacity totals. Historical planned Q1 2024 phase capacity reported from earnings material; overlaps ultimate building capacity and is not proof of current live load. |
Equinix and GIC announced a proposed US$525 million development and operating venture for SL2x and SL3x; closing was conditional.
Supporting source ↗SAMOO identifies 2024 as project completion year; precise commissioning day not established.
Supporting source ↗September 2024 management briefing targeted November groundbreaking; this source does not establish that it occurred.
Supporting source ↗Shinbo reports its SL3x construction contract with POSCO E&C as main contractor.
Supporting source ↗Shinbo lists a September 2025–December 2027 work period; this is not an operator commissioning commitment.
Supporting source ↗Copyright-2024 technical sheet; current facility page instead gives 5,503 m². Scope/date reconciliation needed.
Source ↗Current facility page; conflicts with technical-sheet 5,596 m².
Source ↗Architect description; current operator page describes a ten-storey steel structure, whereas technical sheet describes reinforced concrete. Construction terminology/materials unresolved.
Source ↗Technical-sheet design specification.
Source ↗Design specifications, not actual utilization.
Source ↗Architect claim; certification award not established and UPS terminology differs from operator sheet.
Source ↗Operator technical sheet; named hyperscalers are not confirmed tenants.
Source ↗Do not count SL4 as another physical property.
Source ↗Current facility page listing; certificate scope and validity documents not inspected. Older technical sheet marks several as targeted.
Source ↗Country-level operator statement at retrieval; mechanism and SL3x applicability unresolved.
Source ↗Conditional 2022 agreement; not proof of present land title. CapitaLand involvement separately documented.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-07
Lists the Goyang street address and identifies SL4 as located inside SL2x; publishes current building specifications.
Published Date unavailable · Retrieved 2026-10-07
Copyright 2024, not a confirmed publication date. Identifies Hyangdong location, SL2x 22 MW IT, future SL3x 24 MW, and SL2x technical specifications.
Published Date unavailable · Retrieved 2026-10-07
Korean operator page identifies SL2x in Hyangdong-dong, Deogyang-gu, Goyang, within the Seoul metro and reports 22 MW.
Published Date unavailable · Retrieved 2026-10-07
Current country FAQ describes operating facilities and says SL2x supports 20 MW; states country-wide 100% renewable energy coverage.
Published 2022-01-26 · Retrieved 2026-10-07
Announces SL2x and SL3x joint venture, expected combined capacity above 45 MW, and proposed GIC/Equinix equity shares of 80%/20%.
Published Date unavailable · Retrieved 2026-10-07
Explicitly describes SL2x as adjacent to SL3x and SL4 as within SL2x; still carries historical planned-2024 opening language.
Published 2025-09-30 · Retrieved 2026-10-07
Contractor identifies SL3x new-build telecommunications work, POSCO E&C as main contractor, September 15 award date, and September 2025–December 2027 construction period.
Published Date unavailable · Retrieved 2026-10-07
Architect explicitly links CapitaLand project name to SL2x; lists 2024 completion, 21,769 m² floor area, seven above-ground and three basement levels, and 40 MW active plus 40 MW standby electrical supply.
Published Date unavailable · Retrieved 2026-10-07
Lists parcel-style address 585 Hyangdong-dong, 24 MW hyperscale capacity, 40 MW power capacity, CLI owned and/or managed platform, and under-development status; mapping to SL2x is supported by SAMOO but legal ownership and stale status remain unresolved.
Published 2024-09-26 · Retrieved 2026-10-07
Reports Equinix Korea management describing SL2x as 24 MW including 2 MW for general enterprises, SL3x as 24 MW hyperscale capacity, and planned November 2024 groundbreaking.
Published 2023-11-24 · Retrieved 2026-10-07
Reports SL4 retail space within SL2x, 475 cabinets, connectivity plans, and a planned 12 MW SL2x first phase.
Name: Equinix SL2x Data Center Technical Specifications; Equinix Seoul Data Centers
Kind: Equinix Seoul Data Centers
Country: Equinix SL2x facility page; SL2x 서울 데이터센터 기술 사양
Region: Equinix SL2x facility page
City: Equinix SL2x facility page; SL2x 서울 데이터센터 기술 사양
Metro: SL2x 서울 데이터센터 기술 사양
Address: Equinix SL2x facility page; Equinix SL2x Data Center Technical Specifications
Operator: Equinix SL2x facility page; Korea Data Center, Colocation & AI-Ready Infrastructure; Equinix and GIC to Invest US$525 Million to Build Hyperscale Data Centers in Korea
Business Model: Equinix SL2x Data Center Technical Specifications; DCD: Equinix to launch Seoul IBX data center in Q1 2024, within xScale facility
Scale: SL2x 서울 데이터센터 기술 사양; Equinix and GIC to Invest US$525 Million to Build Hyperscale Data Centers in Korea
Statuses: Korea Data Center, Colocation & AI-Ready Infrastructure; Shinbo: Goyang CapitaLand SL3x telecommunications construction contract; SAMOO: CapitaLand Data Center (EQUINIX SL2x)
Summary: Equinix SL2x facility page; Equinix SL2x Data Center Technical Specifications; Korea Data Center, Colocation & AI-Ready Infrastructure; Equinix Seoul Data Centers; Shinbo: Goyang CapitaLand SL3x telecommunications construction contract; Yonhap: Equinix plans third Korean data center groundbreaking in November
Location: Equinix SL2x facility page; SL2x 서울 데이터센터 기술 사양
Stable identifier: d1e513eb-a294-4bb8-b8ca-b1db24a01e4b