Map
Sign in
← Explore registry

Indonesia / Site

DayOne NDP

OperationalPlanned

Campus capacity; current commissioned share requires reconciliation.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 3
Architectural rendering: DayOne Nongsa Digital Park campus.

Rendering

Architectural rendering: DayOne Nongsa Digital Park campus.

Published date unknown · Captured date unknown · Checked 2026-09-11

Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.

dayonedc.com · Source and attribution ↗
Image rights and date notes

Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.

Site profile

Operator
DayOne
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Riau Islands / Batam
City / locality
Batam
Address
Unknown
Location
OSM named-property point; block/building placement awaits independent confirmation.
Precision: approximate · 1.1891641, 104.1054705
View location on map →
Parent
Not assigned

Location detail

OSM named-property point; block/building placement awaits independent confirmation.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

Address unknown

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
72 MW
Unspecified power
Reported design capacity; energized and occupied load not established
Planned · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review. Campus capacity; current commissioned share requires reconciliation.

Development timeline

  1. No dated milestones established.

Disclosed specifications

No additional specifications established.

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

DayOne Batam market ↗

Published Date unavailable · Retrieved 2026-09-11

Nongsa Digital Park campus: total 72 MW, operation from 2025 onward.

OpenStreetMap — DayOne ↗

Published Date unavailable · Retrieved 2026-09-11

Named map object: DayOne, Jalan Teluk Mata Ikan, Kampung Teluk Mata Ikan, Sambau, Nongsa, Batam, Kepulauan Riau, 29467, Indonesia. Candidate representative point 1.1891641, 104.1054705; not a surveyed coordinate. © OpenStreetMap contributors, ODbL.

Property imagery · dayonedc.com ↗

Published Date unavailable · Retrieved 2026-09-11

Architectural rendering: DayOne Nongsa Digital Park campus. Image reference: https://api.dayonedc.com/wp-content/uploads/2025/07/NPR_DayOne.jpg Visually inspected against the cited source and profile identity.

Operator logo · dayonedc.com ↗

Published Date unavailable · Retrieved 2026-09-11

DayOne operator brand mark. Image reference: https://dayonedc.com/markets/singapores-dayone-breaks-ground-on-first-data-center-in-singapore#header-logo Visually inspected against the cited source and profile identity.

Profile field evidence

Name: DayOne Batam market

Operator: DayOne Batam market

Country: DayOne Batam market

Region: DayOne Batam market

Metro: DayOne Batam market

City: DayOne Batam market

Kind: DayOne Batam market

Statuses: DayOne Batam market

Summary: DayOne Batam market

Aliases: DayOne Batam market

Location: OpenStreetMap — DayOne; DayOne Batam market

Media: Property imagery · dayonedc.com

Operator Logo: Operator logo · dayonedc.com

Stable identifier: ec092cc0-dcaa-47d7-9676-b4f812ad6963