Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

Laverton Campus · CDC Laverton

Under ConstructionPlanned

CDC’s second Melbourne campus is under construction in Laverton North, with further ultimate capacity planned. CDC reports more than 400 MW on completion; this is unspecified capacity rather than established operational IT load. Secondary sources identify 20-38 Leakes Road. Earlier and incremental capacity disclosures require reconciliation.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
CDC Data Centres
Ownership
Unknown / not established
Business model / scale
Colocation / Unknown
Region / metro
Victoria / Melbourne
City / locality
Laverton North
Address
20-38 Leakes Road, Laverton North, VIC 3026
Location
Secondary OpenStreetMap-derived property position published by Mapcarta, associated with 20-38 Leakes Road; address corroborated by a separate secondary property record. Not a surveyed point or verified Google Maps marker.
Precision: approximate · -37.84157, 144.77539
View location on map →
Parent
Not assigned

Location detail

Secondary OpenStreetMap-derived property position published by Mapcarta, associated with 20-38 Leakes Road; address corroborated by a separate secondary property record. Not a surveyed point or verified Google Maps marker.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

20-38 Leakes Road, Laverton North, VIC 3026

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
>400 MW
Unspecified power
Ultimate Laverton campus capacity upon completion
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. Undated operator page retrieved on this date; this is an observation date, not announcement or commissioning date. Capacity basis is not disclosed.

150 MW
Unspecified power
Laverton development described at groundbreaking
Under Construction · unclear
2025-02-17Reported claim ↗

Excluded from capacity totals. Announcement date. Operator calls this a 150 MW campus; later Infratil commentary describes initial capacity. Do not equate this automatically with ultimate campus capacity or IT load.

≥150 MW
Unspecified power
Initial Laverton additional capacity
Under Construction · cumulative
2025-04-14Reported claim ↗

Excluded from capacity totals. Newsletter publication date; written as 150 MW+. Likely overlaps the groundbreaking scope and must not be added to it.

>100 MW
Unspecified power
Laverton built capacity whose construction commenced during the March 2026 quarter
Under Construction · incremental
2026-03-31Reported claim ↗

Excluded from capacity totals. Quarter-end reporting date. Filing published 8 April 2026; describes additional construction activity, not operational capacity. Building allocation and overlap with earlier disclosures are unresolved.

Development timeline

  1. 2025-02-17 · actual_construction_start

    Laverton groundbreaking

    CDC announced work commencement and a first-sod ceremony for the Laverton development.

    Supporting source ↗
  2. 2026-Q1 · actual_construction_expansion

    Further capacity entered construction

    Infratil reports construction commencement for over 100 MW of built capacity during the quarter ended March 2026.

    Supporting source ↗

Disclosed specifications

Security

24/7 on-site security

Operator Melbourne-region statement; site-specific implementation or accreditation documentation was not established.

Source ↗

Resilience

Multiple layers of redundancy; 100% availability claim

Operator regional marketing statement, not an independently verified Laverton operating record or disclosed redundancy topology.

Source ↗

Economic contribution

More than A$2.7 billion during construction

Announcement projection for economic injection, not an established capital expenditure figure.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Melbourne | CDC Data Centres ↗

Published Date unavailable · Retrieved 2026-10-09

Operator identifies Laverton as its second Melbourne campus, currently under construction, and forecasts more than 400 MW when complete. Regional security and resilience statements are also displayed.

Resources:CDC Laverton Campus ↗

Published Date unavailable · Retrieved 2026-10-09

Secondary property record gives 20-38 Leakes Road and Wyndham council jurisdiction; cites LA1 generator-plenum amendment WYP14790/24.06 and earthworks permit WYP15649/26. Linked council records could not be accessed.

Infratil Newsletter – April 2025 (CDC site visit) ↗

Published 2025-04-14 · Retrieved 2026-10-09

Infratil describes Laverton’s initial additional capacity as 150 MW+, distinguishes it from Brooklyn, and describes CDC’s external-customer hosting model and long-term contracts.

CDC Independent Valuation – 31 March 2026 ↗

Published 2026-04-08 · Retrieved 2026-10-09

Infratil filing states that construction commenced on over 100 MW of built capacity at Laverton during the March quarter. Regional Melbourne totals are not exclusively Laverton.

Profile field evidence

Name: Melbourne | CDC Data Centres; Resources:CDC Laverton Campus

Aliases: Melbourne | CDC Data Centres; CDC Laverton Map - City of Wyndham, Victoria, Australia

Kind: Melbourne | CDC Data Centres

Country: CDC Laverton Map - City of Wyndham, Victoria, Australia; CDC brings $2.7BN groundbreaking opportunity to Melbourne’s south-west

Region: CDC’s data centres fueling jobs and growth in the west; CDC Laverton Map - City of Wyndham, Victoria, Australia

City: CDC’s data centres fueling jobs and growth in the west; CDC Laverton Map - City of Wyndham, Victoria, Australia

Metro: Melbourne | CDC Data Centres; CDC’s data centres fueling jobs and growth in the west

Address: Resources:CDC Laverton Campus; CDC Laverton Map - City of Wyndham, Victoria, Australia

Operator: Melbourne | CDC Data Centres; CDC brings $2.7BN groundbreaking opportunity to Melbourne’s south-west

Business Model: CDC brings $2.7BN groundbreaking opportunity to Melbourne’s south-west; Infratil Newsletter – April 2025 (CDC site visit)

Statuses: Melbourne | CDC Data Centres; CDC Independent Valuation – 31 March 2026

Summary: Melbourne | CDC Data Centres; CDC brings $2.7BN groundbreaking opportunity to Melbourne’s south-west; Resources:CDC Laverton Campus; CDC Independent Valuation – 31 March 2026

Location: Resources:CDC Laverton Campus; CDC Laverton Map - City of Wyndham, Victoria, Australia

Stable identifier: f32d316e-beba-4b1c-8d0a-f2cc3a6664fd